Main content
City of Alexandria Homepage
Monday, December 22  •  39°Light Drizzle Air Quality: Yellow
CloseWeather Forecast
Today: High 37° Low 34°
Light RainAir Quality: Yellow
Tue: High 45° Low 42°
CloudyAir Quality: Yellow
Wed: High 62° Low 54°
Rain/ThunderAir Quality: Yellow
Thu: High 53° Low 35°
Partly CloudyAir Quality: Green
Fri: High 54° Low 34°
Sunny
Alert
Schedule of Services for the Christmas Holiday Week -- Updated 12/22/2014 12:38:16 PM

All City of Alexandria government offices will be closed on Wednesday, December 24; Thursday, December 25; and Friday, December 26, in observance of the Christmas holidays. Residential refuse and recycling will be collected on Wednesday, December 24. There is no collection scheduled on Thursday, December 25; and Thursday’s collection will take place on Friday, December 26.

Read More...
City of Alexandria, VA City of Alexandria, VA
T&ES
Share Share RSS RSS Print Print Text Size Text Size NormalText Size LargeText Size Extra Large
Page updated Nov 15, 2012 4:34 PM
CloseComments

No Comments Posted Yet

CloseRSS Options

Potomac Waterfront Flood Mitigation Study

What's New

King, Strand, and Union Streets Nuisance Flood Mitigation Information
The Potomac River Waterfront Flood Mitigation Study, completed in 2010, recommended grading and drainage improvements in the vicinity of Strand Street, the unit block of King Street, and Union Street to minimize the nuisance flooding that frequently occurs in this area.  A preliminary feasibility analysis of this recommendation was presented to the Park and Recreation Commission on November 15, 2012.

Overview

A study was conducted to evaluate flooding conditions and to identify feasible flood mitigation alternatives along the Potomac River. The City of Alexandria engaged URS Corporation to provide technical assistance with this study.

The study considered both nuisance flooding which is generally caused by high tides, as well as extreme flooding up to the predicted 100-year water surface elevation. A wide variety of alternatives, such as flood barriers and flood proofing, were considered to mitigate the flooding problems.

The study concentrates on evaluating solutions and recommending the most effective solutions.  The study also summarizes the detailed engineering assessments conducted as part of the feasibility evaluation of potential measures and recommends cost effective solutions that consider historic/archeological resources, business/tourism impacts, and environmental impacts.

The Potomac Waterfront Flood Mitigation Study was completed in July 2010. 

Flood mitigation, as described in the Potomac Waterfront Flood Mitigation Study, was included in the approved Waterfront Small Area Plan and implementation of the Plan’s recommendations will be developed during FY2013


Study Area

This study encompasses the entire Potomac River waterfront from the Capital Beltway north to approximately Bashford Lane extended. The figure below illustrates this area.

potomac flood study area

Project Documents

Contact

Project Manager 
Brian Rahal, P.E., Civil Engineer III
703.746.4057

301 King St., Room 4100
Alexandria, Va 22314
703.746.4025
Fax: 703.519.3356
E-mail

Office Hours:
Monday-Friday
8:00 a.m. - 5:00 p.m.