Main content
City of Alexandria Homepage
Friday, April 18  •  41°Cloudy Air Quality: Green
CloseWeather Forecast
Today: High 59° Low 44°
Mostly CloudyAir Quality: Green
Sat: High 70° Low 45°
Partly CloudyAir Quality: Green
Sun: High 66° Low 41°
Partly CloudyAir Quality: Green
Mon: High 70° Low 48°
Cloudy
Tue: High 73° Low 48°
Isolated Thunderstorms
City of Alexandria, VA City of Alexandria, VA
Recreation
Share Share RSS RSS Print Print Text Size Text Size NormalText Size LargeText Size Extra Large
Page updated Aug 29, 2012 10:12 PM
CloseComments

No Comments Posted Yet

For Immediate Release: August 30, 2012

Dora Kelley Park Trail Re-Surfacing Project

In early August 2012, the Department of Recreation, Parks and Cultural Activities installed a pervious "Flexi-Pave" trail through Dora Kelley Park, improving the connection to Chambliss Park.

The surface material has continuous voids to allow stormwater to pass through, reducing the frequent flooding and erosion issues that had previously occurred along the trail. Additionally, the material used for the new trail is comprised of 1,597 recycled rubber passenger tires. If stacked in a landfill the tires would be 1,300 feet tall!

We want to know what you think of the project. Please visit http://alexandriava.gov/64152  to complete a survey. 

For additional information, contact Dana Wedeles with the Department of Recreation, Parks and Cultural Activities at 703.746.5491 or dana.wedeles@alexandriava.gov.  

1108 Jefferson St.
Alexandria, VA 22314
703.746.4343
Fax: 703.838.6344
E-Mail

Office Hours
Monday-Friday
8 am - 5 pm

James B. Spengler
Director
703.746.5500