Main content
City of Alexandria Homepage
Friday, October 31  •  57°Cloudy Air Quality: Green
CloseWeather Forecast
Today: High 57° Low 45°
Partly CloudyAir Quality: Green
Sat: High 50° Low 39°
RainAir Quality: Green
Sun: High 50° Low 35°
Sunny/WindAir Quality: Green
Mon: High 62° Low 40°
SunnyAir Quality: Green
Tue: High 66° Low 47°
Partly CloudyAir Quality: Yellow
City of Alexandria, VA City of Alexandria, VA
Recreation
Share Share RSS RSS Print Print Text Size Text Size NormalText Size LargeText Size Extra Large
Page updated Aug 29, 2012 10:12 PM
CloseComments

No Comments Posted Yet

For Immediate Release: August 30, 2012

Dora Kelley Park Trail Re-Surfacing Project

In early August 2012, the Department of Recreation, Parks and Cultural Activities installed a pervious "Flexi-Pave" trail through Dora Kelley Park, improving the connection to Chambliss Park.

The surface material has continuous voids to allow stormwater to pass through, reducing the frequent flooding and erosion issues that had previously occurred along the trail. Additionally, the material used for the new trail is comprised of 1,597 recycled rubber passenger tires. If stacked in a landfill the tires would be 1,300 feet tall!

We want to know what you think of the project. Please visit http://alexandriava.gov/64152  to complete a survey. 

For additional information, contact Dana Wedeles with the Department of Recreation, Parks and Cultural Activities at 703.746.5491 or dana.wedeles@alexandriava.gov.  

1108 Jefferson St.
Alexandria, VA 22314
703.746.4343
Fax: 703.838.6344
E-Mail

Office Hours
Monday-Friday
8 am - 5 pm

James B. Spengler
Director
703.746.5500