Requirements for Residential Basement Alterations/Renovations
****The following content is under construction, additional information will be provided as it becomes available - thank you for your patience****
Documentation Process
- Plan Submission Checklist - Finishing a Basement
- 5 plan sets:
- Plan size should not be smaller than 8 ½” x 11”
- Dimensioned plans are required
- Plans shall be in permanent ink, with address of the proposed construction
- Tissue and tracing paper will not be accepted
- Note: per Virginia’s USBC, One & Two-family dwelling construction permits, including accessory structures, must be completed within 3 years of permit issuance date
- Construction Application
- Contractor Selection Checklist /Property Owner’s Affidavit
- Noise Ordinance Affidavit
- Alexandria Soils Policy (refer to policy for proposed project specific requirements)
- Rodent Abatement Documentation
- Home Improvement License Application Package attached *Required for Class B and Class C contractors* also see The Home Improvement Code Waiver Form
- House Location Plat (Planning & Zoning)
- Floor Area Open Space Calculation Sheet (Planning & Zoning)
- A/C Waiver form (if proposed unit is in a required yard) (Planning & Zoning)
Additional permits required if project includes:
Plan Review Process
Inspection Process
Certificate of Occupancy Process
Not required